S2VE

Demo workspace · VX-150-TRN

VoltAxis V150 — Installer training series

This is what governed production looks like from the inside. Every claim has a source and an owner, every likeness has a consent record, and every gate has a named human signature. The demo data below is fictional but structurally real.

Client
VoltAxis Energy Systems
Status
In production
Version
v0.4 draft
Owner
M. Okafor (VoltAxis enablement lead)
Markets
EU, UK
Locales
en-GB, de-DE, fr-FR
Claims approved
4 / 6
Scenes
6
Gates passing
3 / 6
Versions
4

QA gates

Six gates, named sign-off, no silent passes

Automated checks prepare the evidence; a reviewer with the right role accepts or rejects each gate. Production is blocked until every gate passes.

Claim integrity

warn

CLM-004 lacks evidence and is excluded from the script; 5 of 6 claims approved.

Pending — Compliance

Consent and likeness

pass

CR-01 and CR-02 in scope for training use in EU/UK; all records unexpired.

Signed — K. Adeyemi, 2026-08-19

Brand and tone

pass

Terminology matches VoltAxis brand kit v2.1; disclaimers present.

Signed — R. Voss, 2026-08-20

Safety and compliance

fail

SC-03 is safety-critical and requires real footage; upload pending from Hamburg depot.

Blocked — Field operations

Accessibility

pass

Captions, transcript and reading speed pass for en-GB; de-DE/fr-FR queued.

Signed — automated + L. Chen

Technical delivery

warn

16:9 master conforms; 9:16 vertical cut not yet rendered.

Pending — Post

Claim ledger

Every factual statement, traced

The script may only use approved claims. CLM-004 is excluded until a customer study exists; CLM-006 was superseded and every scene that used it was re-cut.

IDStatementSourceOwnerEvidenceStatus
CLM-001The V150 delivers up to 150 kW DC fast charging.V150 datasheet v4.2Product engineeringCertified test report TÜV-2026-0417Approved
CLM-002A two-technician crew completes installation in under four hours.Field study FS-118 (n=34 installs)Field operationsField study FS-118, median 3h 41mApproved
CLM-003The V150 is OCPP 2.0.1 compliant.Compliance registerComplianceOCPP certification OCT-2.0.1-0092Approved
CLM-004Fleet operators see 30% less charger downtime.Marketing draft, 2026-07MarketingNone on file — customer study requiredEvidence needed
CLM-005The enclosure is IP54 rated for outdoor installation.V150 datasheet v4.2Product engineeringIEC 60529 test reportApproved
CLM-006Compatible with all CCS2 vehicles.Datasheet v3.8 (superseded)Product engineeringReplaced by CLM-009 compatibility matrix in v4.2Superseded

Shotlist

Generated where safe, real where it matters

SC-03 is safety-critical installation work, so the pipeline plans for real footage and blocks the safety gate until it arrives. Generation handles the rest.

SceneTitleDurationChannelPresenterClaimsStatus
SC-01Cold open — depot at dawn0:08generatedLocked
SC-02Presenter introduction0:22generatedAva Lindqvist (digital, CR-01)CLM-001Locked
SC-03Installation sequence — mount, wire, energise0:45real footageM. Ferreira (CR-02)CLM-002, CLM-005Awaiting footage
SC-04Charging session walkthrough0:18screen captureVoiceover — Ava Lindqvist (CR-01)CLM-003In edit
SC-05Specification callouts0:15motion graphicsCLM-001, CLM-003, CLM-005In edit
SC-06Close and certification CTA0:10generatedAva Lindqvist (digital, CR-01)Draft

Consent records

Likeness, voice and location — scoped and expiring

  • CR-01Active

    Ava Lindqvist — digital likeness and voice

    Marketing and training video · EU, UK · expires 2027-03-31

  • CR-02Active

    Marco Ferreira — on-camera field footage

    Training content only · EU · expires 2026-12-31

  • CR-03Expiring soon

    Hamburg depot — location release

    B-roll, all channels · Worldwide · expires 2026-09-30

Change log

Every version carries a diff and a reason

  1. v0.42026-08-21

    CLM-004 excluded from script pending customer study; SC-05 callouts rebuilt against approved claims only.

  2. v0.32026-08-14

    de-DE and fr-FR scripts entered localisation; claims re-checked after translation.

  3. v0.22026-08-07

    CLM-006 superseded by the v4.2 compatibility matrix; two scenes re-cut.

  4. v0.12026-07-30

    Initial assembly from intake interview with VoltAxis field operations lead.

Your turn

Run your own knowledge through the same pipeline

Start with an intake — an expert interview, a document set, or an existing SOP — and S2VE drafts the claim ledger before anything is generated.